Most homeowners who are about to remodel have already done one thing that's public: they, or their contractor, applied for a building permit. Counties publish those records, often every day, with the address, the type of work, a short description and sometimes the declared cost. For a contractor, that's a list of people who've already decided to spend money on their homes.
This guide covers where to find permit data in DC and Montgomery County, which records are worth your time, and how to turn them into conversations.
Where the data lives
- Washington, DC: the Department of Buildings publishes Building Permits in the Last 30 Days and a dataset for each year on Open Data DC. To look up one address, use DOB's Scout.
- Montgomery County: the Department of Permitting Services publishes Residential Permit and Commercial Permits on dataMontgomery, updated daily.
Both can be downloaded as a spreadsheet. The catch is volume: DC issued 3,801 permits in the first 29 days of October 2026, and more than half were electrical, plumbing and mechanical trade permits. Most of them aren't leads for a remodeler.
What's in a permit record
| Field | What it tells you |
|---|---|
| Work type | Montgomery uses ADD (addition), ALTER (alteration), CONSTRUCT (new) and others. DC uses permit types (construction, postcard, supplemental) and subtypes such as alteration and repair. |
| Description | The scope in the applicant's words: "two-story rear addition", "kitchen remodel, remove wall". This is where the best signals are. |
| Declared value | The cost the applicant reported (Montgomery). It's an estimate, not a contract price, but it separates a $15,000 job from a $200,000 one. DC's open data doesn't include it. |
| Square feet | Area added or altered (Montgomery). Useful for judging scope. |
| Use | Single-family house, townhouse, deck, shed, pool. |
| Status and dates | When it was applied for and issued. An issued permit means work is about to start. |
Sorting good leads from noise
A practical filter for a remodeling or addition contractor:
- Keep additions and alterations on single-family houses and townhouses.
- Look for strong words in the description: addition, second story, dormer, bump-out, basement finish, kitchen, primary suite, structural, load-bearing.
- Rank by declared value and size. In Montgomery, the median declared value of an addition in October 2026 was $75,000, and a quarter were $177,000 or more.
- Drop what isn't yours: solar, fences, sheds, water heaters, HVAC swaps and trade-only permits.
- Watch the negatives. "Interior alteration without structural modification" isn't a structural job, and "non-load-bearing wall" isn't a beam job.
Timing: who you're really reaching
By the time a permit is issued, the homeowner has usually hired a designer and often a general contractor. That doesn't make the lead worthless. It changes who you should talk to:
- Subcontractors and specialty trades: the general contractor on a fresh addition still needs framing, roofing, windows, electrical and finishes. Trade permits issued later at the same address show the job is moving.
- Design-build and general contractors: applications and permits for small additions are worth a call, because not every owner has locked in a builder. Watch for later phases too, such as a basement after an addition.
- Suppliers and finishers: cabinets, countertops, flooring and closets come at the end. A permit issued 6 to 10 weeks ago is a good time to make contact.
Reaching out the right way
- Mail is the simplest and most respectful channel. A short letter to "Current Resident" at the property address works, and it doesn't need any personal data beyond what's on the public record.
- Be specific. "I saw the permit for your rear addition on Glen Road" gets read. "Do you need a contractor?" doesn't.
- Never imply you're from the county or that the homeowner has to respond.
- Follow the rules for calls, texts and email if you use them, including do-not-call rules. When in doubt, ask your attorney.
- Respect a no. One follow-up is plenty.
A simple weekly routine
- Monday morning: pull last week's permits for your ZIP codes.
- Filter and score them, and keep the top 10 to 15.
- Look each one up on the county's permit search to read the full record.
- Send a letter or make a call with one specific opening line.
- Track who you contacted so you don't repeat yourself.
That's about two hours a week by hand. Scope Pro does the first three steps for you and keeps your area exclusive, so no other subscriber in your trade gets the same sheet.
