A permit record is short, but it tells you more than most leads do: what the owner is building, roughly how big it is, sometimes what they expect to spend, and how far along it is. Here's how to read one quickly and turn it into a good first conversation.

Start with the work type

You seeIt usually means
ADD (Montgomery) or "addition" in DCNew space: a rear addition, second story, sunroom or bump-out. The biggest jobs.
ALTER (Montgomery) or "alteration and repair" (DC)Work inside the existing footprint: kitchens, baths, basements, walls moved.
CONSTRUCT (Montgomery) or "new building" (DC)A new house, or a new structure such as a deck or garage. Read the use field.
Postcard or instant permit (DC)A small, simpler job that DC lets owners and contractors permit quickly online.
Supplemental, electrical, plumbing or mechanical (DC)Trade permits, often issued alongside or after the main permit.

Read the description for the real scope

The description is the applicant's own summary, and it's where the best signals hide. Look for:

  • Size words: two-story, second floor, cellar, 3,400 sq ft new.
  • Structural words: structural, load-bearing, beam, framing. These mean engineering and framing work.
  • Rooms: kitchen, primary suite, basement finish, in-law suite.
  • Negatives: "interior work only", "without structural modification", "non-load-bearing". These shrink the job.
  • Related permits: "sister permit to…" means several permits belong to one project.

Use declared value and size to size the job

In Montgomery County, the applicant reports a declared value, their estimate of the project cost, and the square footage added or altered. Treat both as rough guides, not contract prices. They're good for ranking: a $225,000 addition with 3,400 sq ft new is a different conversation from a $15,000 kitchen refresh. DC's open data doesn't include project value, so in DC the description and permit type do the work.

Check the status and dates

  • Applied or in review: the owner may still be choosing a builder. The best time for a general contractor to call.
  • Issued: work is about to start. The general contractor is usually set, but trades and suppliers are still being lined up.
  • Finaled or closed: the job is done. Not a lead now, but a good record of who works in the area.

What to say on the first call

One concrete question beats a sales pitch. These are the opening lines Scope suggests on its sheets, matched to what the permit shows:

If the permit showsTry opening with
A second-story or two-story addition"Who drew the second-story plans, and is the framing out to bid yet?"
Any addition"Which architect drew the addition, and have you chosen a framer?"
A basement finish"Is the basement finish bid yet? I can walk it with you this week."
Structural or load-bearing work"Who's your structural engineer, and is the beam work bid?"
A kitchen or bath remodel"Have you picked cabinets and fixtures, and is the remodel out to bid?"
A new house"Which trades are still open on the build?"
Roofing after a storm"Can I inspect this week and photograph it for your insurance claim?"

Put it together

Picture a Montgomery permit that reads: ADD, single-family dwelling, "two-story and cellar addition, 3,400 sq ft new", $225,000 declared, issued last week. That's a big addition that's ready to build. If you frame, call the general contractor about framing. If you're a general contractor, the job is probably taken, but the owner may want a basement or kitchen phase next year. Scope Pro scores a permit like this 93 out of 100 for remodelers and puts it at the top of the Monday sheet.