The short answer: painting, flooring, cabinets and like-for-like repairs usually don't need a permit. Anything that adds space, moves walls, adds a deck or touches electrical, plumbing, gas or HVAC usually does. The details differ between Washington, DC and Montgomery County, and if your home is historic, the rules are stricter.

Common projects side by side

ProjectWashington, DCMontgomery County
Painting, flooring, cabinets, countertopsUsually no permitUsually no permit
Replace roofing, siding or gutters with the same kind of materialUsually no permit (in-kind replacement)Usually no permit (roof covering only, siding, gutters)
Replace windows or doors, same size openingsUp to 15 windows in kind can be an Instant Permit; more needs a permitUsually no permit if the opening size doesn't change
Kitchen or bath remodel that moves walls, plumbing or wiringPermit required (alteration, plus trade permits)Permit required; up to 400 sq ft can use Fast Track (1–2 days). Plumbing through WSSC
Finish a basementPermit required (interior alteration)Permit required; up to 400 sq ft can use Fast Track
Build a deckPermit required; one-level decks can go through the Homeowner's CenterPermit required for all decks; single-level decks can use Fast Track
Addition or second storyPermit required, with plan review and zoning; historic review if applicablePermit required, with plan review; post a notice sign; historic and town approvals if applicable
FencePermit required (repairs in kind are exempt)Permit likely required
ShedNo permit for one shed of 50 sq ft or less and under 10 ft tallPermit likely required; small sheds under 200 sq ft can use Fast Track
Retaining wallNo permit at 4 ft or less (one- and two-family homes)No permit at 48 in or less with no extra load
Electrical, plumbing, gas or HVAC changesPermit required, issued to licensed trade professionalsElectrical and HVAC permits from DPS; plumbing and gas from WSSC Water
Summarized from the DC Department of Buildings and Montgomery County DPS. See the full guides for details and exceptions.

If your home is historic

In DC, the usual exemptions apply only outside historic districts. Inside one, exterior work goes to the Historic Preservation Office, and small changes are usually answered within a few days. In Montgomery County, properties on the Master Plan for Historic Preservation need a Historic Area Work Permit for substantial exterior changes. In both places, interior work generally isn't part of historic review.

Who should pull the permit?

  • You can, for many building permits in both places, if you own the home. You then take responsibility for the work meeting code and passing inspections.
  • Licensed trades must pull electrical, plumbing, gas and mechanical permits. In Montgomery, plumbing and gas go through WSSC Water.
  • Your contractor usually pulls the permit as part of the job. In DC, home improvement contractors need a Home Improvement Contractor license from DLCP. In Maryland, only MHIC-licensed contractors may contract with homeowners. Check the license before you sign.

Why it's worth doing it right

  • Inspections protect you. An inspector checks the framing, wiring and plumbing before they're closed up behind walls.
  • It's on the record. Permits are public, and buyers and their inspectors look them up when you sell.
  • It avoids rework. Unpermitted work can mean opening walls later, fines, or problems with insurance claims.

Next steps

  1. Read the guide for your area: DC permits or Montgomery County permits.
  2. Use the official tools: DC's Permit Wizard, or a free pre-design consultation with Montgomery County DPS.
  3. Look up what your neighbors have permitted, using DC's Scout or Montgomery's eSearch. It's a realistic picture of what gets approved on your street.
  4. When you're ready to plan the project, Hawthorne Mason can help you scope it and introduce you to vetted, independent contractors.